
PHPA Oilfield Grade
Our PHPA is engineered for oilfield applications. With molecular weight of 15-25 million and controlled hydrolysis degree of 25-35%, it provides excellent viscosity for polymer flooding EOR and superior shale inhibition in drilling fluids.
Specifications
| Type | Anionic (PHPA) |
| Molecular Weight | 15–25 million Da |
| Hydrolysis Degree | 25-35% |
| Solid Content | ≥91% |
| Dissolving Time | ≤120 min |
| Apparent Viscosity (0.1%) | 30–80 mPa·s |
| Filtration Loss | ≤15 mL |
| Packaging | 25 kg PE-lined bags + Kraft paper |
Key Features
- 10–15% incremental oil recovery proven
- Excellent shale inhibition in drilling
- Salt-tolerant formulation available
- Oilfield test data available for confirmed grades
Applications
- Enhanced Oil Recovery (EOR) — polymer flooding
- Drilling fluid viscosifier & shale inhibitor
- Fracturing fluid additive
- Pipeline drag reduction
Brand Equivalents & Replacements
Our PHPA Oilfield Grade is a tested replacement for these international brands. Free samples available for side-by-side comparison.
| Brand | Grade | Notes |
|---|---|---|
| SNF | FLOPAAM 3630S | Industry standard EOR polymer — our PHPA is a direct equivalent |
| NALCO | NALCO 8102 | Drilling fluid additive, comparable viscosity |
| Kemira | Superfloc N-300 | Drilling grade PHPA equivalent |
| Hengfloc | Hengfloc 63026 | Chinese EOR polymer — we offer same specs at competitive pricing |
Need a replacement for a different grade? Contact us with your current product specs.
Dosage Guide
1,000–2,500 ppm for polymer flooding; 0.5–3 kg/m³ for drilling fluid.
Frequently Asked Questions — PHPA Oilfield Grade
Is your PHPA a direct substitute for FLOPAAM 3630S?
Yes. Our PHPA provides equivalent viscosity (30–80 mPa·s at 0.1%), same MW range (15–25M), and same hydrolysis degree (25–35%). We have field data from Daqing and Shengli oilfields confirming interchangeable performance.
What salinity can it tolerate?
Standard grade works up to 10,000 ppm TDS. Our salt-tolerant formulation handles 30,000+ ppm TDS and is suitable for Middle East and offshore reservoirs.
What is the minimum order for EOR projects?
Pilot: 5 MT minimum. Full-scale: 50+ MT/month supply agreements available. We supply Daqing, Shengli, ONGC (India), and ADNOC projects.



