Municipal Sludge Dewatering — Belt Press or Centrifuge
Evaluation scenario — CPAM grade screening for mixed municipal sludge
The Problem Buyers Bring Us
Municipal plants running belt presses or decanter centrifuges usually ask two questions before changing polymer: which cationic charge density matches their sludge, and what dosage per ton of dry solids to budget. Cake dryness, filtrate clarity and polymer consumption all move together, so a grade cannot be chosen from a catalogue line alone.
What We Need From You
- Sludge type and origin: primary, secondary, mixed or digested
- Dry solids content of feed sludge (%) and daily tonnage of dry solids
- Dewatering equipment: belt press, decanter centrifuge, screw press or filter press
- pH, temperature and conductivity of the sludge
- Current polymer type, dosage per ton dry solids and achieved cake dryness
- Target cake dryness and any discharge or disposal limit you must meet
How the Screening Runs
- We propose a shortlist of cationic grades across a charge-density range rather than one grade, because digested and secondary sludges respond differently.
- You receive free samples of the shortlisted grades for jar testing, or send us a fresh sludge sample and our lab runs the screening.
- Each grade is made up as a 0.1-0.5% stock solution, dosed across a bracketing series, and flocculated under the mixing intensity your machine applies.
- The two or three grades with the best floc strength and water release move to a plant-scale trial on one shift before any bulk order.
What Gets Measured
- Capillary suction time or drainage time at each dosage step
- Cake dry-solids content after pressing (%)
- Filtrate or centrate suspended solids and visual clarity
- Polymer consumption in kg per ton of dry solids at the working dosage
- Floc shear resistance after recirculation through the feed pump
Pass / Fail Criteria
- Cake dryness at least equal to your current polymer at the same or lower dosage
- Filtrate clarity no worse than the baseline you record before the trial
- A stable dosage window, so that a small dosing error does not collapse the floc
- Repeatable results across at least two sludge samples taken on different days
Documents You Receive
TDS for each shortlisted grade, SDS, COA for the batch supplied, and a written jar-test record with the dosage series and measured values.
Send the inputs listed above and we will return a grade shortlist, a jar-test plan and a quote with MOQ 500 kg and lead time 7-10 days.
